Make-before-break contacts ensure
digital field instruments remain powered and the process
is undisturbed. Analog output signals are briefly driven by
both cards for < 5 ms during switchover of the card.
Hardware Alerts automatically report hardware integrity errors
for both the primary and secondary cards. Any event that
causes a switchover is also reported automatically through the
system hardware alerts and is logged in the Event Chronicle.
Events that can cause a switchover include.
• Hardware failure within the active card.
• Communications failure between the active card and the controller.
• Detection of a fault in the field wiring.
A switchover may also be initiated from the diagnostics
explorer, and the health and status of both cards and
their channels are available in the diagnostics explorer.
The system automatically commissions a new standby card.
In safe areas, failed cards can be replaced under power.
In hazardous areas, appropriate installation procedures
must be followed.
Leave a comment
Your email address will not be published. Required fields are marked *