Service duration
Typically 1 day on-site to inspect the roll force measurement installation, evaluate and give
recommendations if further actions are needed.
During at least 4 hours, load cells and pressure plates need to be accessible outside the mill stand
for inspection and testing. This can be done during a planned maintenance stop, or by the customer
exchanging to spare load cells and spare pressure plates in the mill stand in advance.
Additional time for travel, preparation, analysis and reporting is needed.
Note: Free access to the mechanical parts and the mounting surfaces
in the actual mechanical installation is essential for achieving
the expected goals with the Health Check during the site visit. The
accessible parts required for different load cell types and positions
in the mill stand are listed below.
The parts and mounting surfaces mentioned above need to be accessible
before the start of the work or otherwise the investigation of
them need to be planned for in advance so that it can be performed
later during the site visit.