Monitoring of paralleling conditions
This function compares the actual values with their set
maximum values and releases paralleling (CHK RELEASE) if
all conditions are fulfilled simultaneously.
Command generation
The command generation calculates the necessary lead angle
αv, by which the paralleling command must be advanced
due to closing time delay. The action ensures that the main
contacts close at precisely the right time. If α reaches αv at
the same time as paralleling release (CHK RELEASE), the
command is issued. Under synchronous conditions, ie,
permanent paralleling release during the adjustable monitoring
time, tsup, the CMD is also issued without taking the lead
angle into consideration.
Synchrocheck mode (paralleling monitoring)
In synchrocheck mode, only the measuring and monitoring
function blocks are active. The output relay is closed during
paralleling release.
Leave a comment
Your email address will not be published. Required fields are marked *