Principle of operation
The synchronizing and paralleling process can be divided
into the following blocks
Measuring
Voltage difference ΔU (amplitude), slip s (frequency diffe
rence), and phase-angle α, are all required for paralleling.
These values are formed from the two measurement signals
U1 and U2 (see illustration, left).
Matching
Voltage and frequency matching functions reduce the voltage
difference ΔU, and slip s by sending adjusting pulses to the
voltage or turbine regulators.
Monitoring of paralleling conditions
This function compares the actual values with their set
maximum values and releases paralleling (CHK RELEASE) if
all conditions are fulfilled simultaneously.
Leave a comment
Your email address will not be published. Required fields are marked *