Minimum genset load in island operation
Minimum genset load constraint is available in the ASC Plant Management.
The constraint applies in island operation only. This constraint will cause the
sustainable power penetration to decrease in case it is compromised.
This is to secure a certain amount of load on the gensets, eliminating the risk
of reverse power situations and impure combustion and exhaust problems.
Spinning reserve
The ASC Plant Management offers spinning reserve support as a percentage of the produced power,
as part of an existing superior system (for instance an existing PLC system) or by means
of short-term cloud detection functionality, depending on your application and requirements.
Ideal for self-consumption applications
While in grid parallel mode, the ASC Plant Management is capable of feeding surplus PV
energy to the grid and generate profit in accordance with grip operator feed-in tariffs.
Alternatively, the ASC Plant Management can regulate the PV production to match the
self-consumption thereby preventing any feed-in of PV power
to the grid if prohibited by grid operator regulations.
Leave a comment
Your email address will not be published. Required fields are marked *