Make-before-break contacts ensure digital field instruments remain powered and the process is
undisturbed.
Analog output signals are briefly driven by both cards for < 5 ms during switchover of the card.
Hardware Alerts automatically report hardware integrity errors for both the primary and secondary cards.
Any event that causes a switchover is also reported automatically through the system hardware alerts and
is logged in the Event Chronicle.
Events that can cause a switchover include.
Hardware failure within the active card.
Communications failure between the active card and the controller.
Detection of a fault in the field wiring.
A switchover may also be initiated from the diagnostics explorer, and the health and status of both cards
and their channels are available in the diagnostics explorer.
The system automatically commissions a new standby card.
In safe areas, failed cards can be replaced under power.
In hazardous areas, appropriate installation procedures must be followed.
Leave a comment
Your email address will not be published. Required fields are marked *