Installation
It is the responsibility of the OEM, system integrator, or
end user to properly install the PLC equipment for safe
and reliable operation. Product manuals provide
detailed information about installation, startup, and
proper use of the PLC equipment. The installation
manual, shipped with your PLC programming software,
describes how to properly install the equipment. If the
PLC installation must comply with supported standards,
such as FCC or CE Directives, please refer to the
Installation Requirements for Conformance to Standards,
shipped with the PLC programming software, for
additional guidelines.
•Installation should not be attempted without refer
ring to the applicable Programmable Controller Installa
tion Manual.
•Connect the battery to either of the battery connec
tors on the module (see Figure 2).
•Put the toggle switch in the STOP position.
•Put the keyswitch in the Memory Protection OFF posi
tion.
•Make sure that rack power is off.
•Install the CPM 790 module in slot 1 of rack 0.
•Turn on power.
The module should power up and the top LED should
blink. When the diagnostics have completed
successfully, the top LED stays on and the second and
third LEDs are off. The fourth LED is off if the
keyswitch is in the OFF position. The CPU is now
ready to be programmed (if connected parallel, the CPU
can be programmed regardless of key position). After
the program has been verified the toggle switch can be
moved to the appropriate operation mode position.
The LEDs indicate the position of the toggle switch,
memory protection status, and the state of the program.
Leave a comment
Your email address will not be published. Required fields are marked *