INSTALLATION
Refer to the INSTALLATION chapter of the M-2270 Adapter Panel Application
Guide for the M-2270’s outline and hole drill dimensions. Slide the M-2901
Surface Mounting Kit’s mounting bracket onto the bottom of the M-2270 so
that the terminal block is facing outward. Using the wires provided on TB3.
make the wiring connections to TBl and TB2 of the M-2270. as shown in the
figure TB3 Connections for the M-2901 Surface Mounting Kit.
Mount the M-2001 Tapchanger Control to the back of the M-2270 Adapter
Panel and secure with the four screws provided. The four screws are shipped
in a drawstring bag which is attached to the adapter panel.
Insert the plug from the adapter panel into the connector at the base of the
M-2001.
Then install the M-2270 Adapter Panel (with the M-2001 Tapchanger Control
and M-2901 Surface Mounting Kit) onto the flat surface, securing with the four
hex female stand-offs and screws provided with the kit.
INTERFACE
External connections are made to the 27-pin terminal block TB3 on the
M-2901’s mounting bracket, and provides standard functions, such as motor
power input, voltage input, voltage reduction and tapchanger raise and lower,
along with auxiliary functions, such as self-test alarm, user-programmable
alarm and operations counter. TB3 has matching connections with the M-2270
Adapter Panel’s TBl and TB2 pin numbers.
Leave a comment
Your email address will not be published. Required fields are marked *